Set-up instructions, Installing the tank, Caution – Robinair 34134-2K Refrigerant Recovery, Recycle, Recharge Unit User Manual
Page 8

6
© 2000 Robinair, SPX Corporation
Set-Up Instructions
INSTALLING THE TANK
The new tank comes with a dry nitrogen charge of 10 to 15 psi (4.9 to 7.4 bar) to
keep it clean and dry during shipment. To install the new tank, you will need to:
1. Purge its nitrogen charge by opening either valve on the tank, vent the pressure
to the atmosphere, then close the valve.
2. Place the unit tank on the scale platform on the back of the unit (see illustration
on page 5 for location). Then attach the tank strap to the tank handle.
3. Attach the temperature probe at the approximate location shown below.
CAUTION!
Some tanks have slightly different valve configurations. Be sure to
connect the VAPOR hose to the GAS (vapor) valve and connect the LIQUID hose to
the LIQUID valve.
5cm (2 in.)
Temperature
Probe
Valves:
Blue Liquid Valve
Red Vapor Valve
Valve ports
t
t
t
t
t
s
s
s
s
s
INST 0494