beautypg.com

Operation, Ransburg, Theory of operation – Ransburg LEPS5001 Power Supply for LECU5003 User Manual

Page 16

background image

OPERATION

THEORY OF OPERATION

-REFER TO FIGURE 3

0 to 120 VAC input is supplied to terminals TB2-

4 and TB2-5 of the LEPS5001 Power Supply

from the LECU5003 Control Panel. Inside the

LEPS5001 Power Supply, this 0 to 120 VAC

signal is supplied to the primary of high voltage

transformer 2T. In operation, alternate halves

of transformer 2T’s high voltage secondary AC

waveform charge capacitors C1 and C2 to the

peak voltage of the secondary output. Since

the capacitors are connected in series, the pow-

er supply output voltage is nearly twice the peak

voltage from the transformer, in this full-wave

voltage doubler circuit.

High voltage from the doubler circuit is connect-

ed to an output series resistor (R3) as protec-

tion against output transients. A current feed-

back signal is supplied to the control panel from

the cathode of 1REC and voltage feedback

signal is supplied through R2.

Zener diodes 1DZ and 2DZ serve as voltage

limiting devices in the event that the kV or cur-

rent feedback wires (31 or 34) become acciden-

tally disconnected from the LECU5003 Control

Panel.

LEPS5001 Power Supply - Operation

13

Ransburg

CP-95-02.5