Daily - Startup & Shut-Down UltraBond Adhesive Unit

DAILY STARTUP

1.

Check and refill all components and materials.


2.

On the Duo Link unit close the relief valve on the flush tank lid.


3.

On the ram adhesive pumps open the lockout ball valve (7702-2-2) to pressure up the system.


4.

On the ram adhesive pumps slowly open the air ball valve (09350) to the pump.


5

On the Duo Link unit open the main air supply to pressure up the system.


6.

On the Duo Link unit push and hold the priming button while slowly opening the air ball valve
to the pump.


7.

Remove the night cap plug (HOD-1002).


8.

Apply a small amount of red grease (7607-2-1) to the threads of the dispensing head.


8.

Reassemble and attach static mixer assembly.


9.

Check flush system for proper operation.


DAILY SHUT-DOWN

1.

Drain water trap filter (06989) daily.


2.

Thoroughly flush the dispensing head.


3.

Remove static mixer tube and push the four static mixers (05271) out of tube.


4.

Thoroughly clean mixers and mix tube with solvent.


5.

On the ram adhesive units close the air ball valve (09350) to the pump.


6.

On the ram adhesive units close the lockout ball valve (7702-2-2) to relieve air pressure from
the system.


7.

On the Duo Link unit close the air ball valve to the pump


8.

On the Duo Link unit close the lockout ball valve (7702-2-2) to relieve air pressure from the
system


9.

Lift the relief valve on the flush tank lid to release flush tank pressure.


10.

Install night cap plug (HOD-1002) to the front of the dispensing head.


NOTE: Do not leave barrel piston in 55-gallon drum if the system will be idle for more then two

weeks.