beautypg.com

Magnum Venus Plastech ULTRABOND IMP-DUO-54646 User Manual

Page 4

background image


15.

At the air manifold, slowly increase regulator marked pump. Do this for both of the ram
adhesive pumps.


16.

Adjust pump regulators as needed to maintain a slow uniform movement of the adhesive
pumps.


NOTE: It may take more pressure for one drum of material than another as the viscosity may

be different.


17.

At the Duo Link unit slowly increase the pump pressure as needed to maintain a slow uniform
movement of the Duo Link adhesive pumps.


18.

Allow units to run until a steady flow of adhesive material is being dispensed out both sides of
the dispensing block with no air pockets.


19.

Push the dispensing head handle to the close position.


20.

Flush both sides of the dispensing head.


21.

To build fluid pressure, push the priming button (09188) located on the Duo Link air manifold
that is labeled prime.


22.

While pushing the priming button in, slowly increase the pump regulator, 80 to 90 psi for
maximum flow rates. Once pump has come to a stop, release priming button.


NOTE: For best results perform a ratio check at the dispensing head. The pump pressure on

the ram adhesive units should be kept as low as possible to prevent over riding the
inlet balls in the Duo Link unit. The pressure may need to be adjusted differently on two
ram units because of viscosity differences and to reach a 1:1 ratio.


NOTE: Apply a small amount of red grease on the dispensing head threads before installing

mix tube to gun.


23.

Install mixing tube (05260) onto gun head, making sure there is a seal (02029-1) between the
mix housing and the adapter union fitting (54861-1). The static mixers (05271) have a notch
on one end that inner lock the four mixers together.


NOTE: The notch should face up when installing into the mix tube (05260).