beautypg.com

Magnum Venus Plastech UltraMAX VHPC-1000 Series User Manual

Page 22

background image

VHPC-1000 Metering Pump Manual


Rev. 05/2012

Page | 22

18. Align the Outlet Body (4101-14-1) so the outlet port is one hex flat to the left of the inlet

port of the Inlet Body (4101-7-1). See Fig. 4.1.


19. Tighten the Lock Nut (4101-1-1) up against the Outlet Body to secure it in position.


The Metering Pump Assembly is Complete.






Offset intake and outlet
ports one flat hex as
shown in figure.

Fig. 4.1