beautypg.com

Metering pump assembly – Magnum Venus Plastech UltraMAX VHPC-1000 Series User Manual

Page 20

background image

VHPC-1000 Metering Pump Manual


Rev. 05/2012

Page | 20

PISTON ROD

PACKING
NUT

UPPER GUIDE

PACKING SET (5 pc.)

OUTLET BODY

Metering Pump Assembly:

1.

Insert the 7/16” SS Ball (9201-1-14) into the Inlet Body (4101-7-1).



2.

Position an O-Ring (O-S-014) onto the notched end of the Cylinder (4102-6-1).



3.

Screw the notched end of the Cylinder (4102-6-1) into the Inlet Body (4101-7-1). Turn by
hand until it bottoms on the Inlet Body, “snug tight”.

4.

Thread the Lock Nut (4101-1-1) onto the Cylinder (4102-6-1) until it bottoms on the Cylinder
shoulder.

5.

Install an O-Ring (O-S-014) onto the long threaded end of the Cylinder (4102-6-1).


6.

Install the Packing Nut (4102-3-1), Upper Guide (4102-4-1) and Packing Set (4102-5-1)
onto the Piston Rod (4102-2-1). See orientation of the Packing Set below.





















NOTE

Care must be taken to not scratch or dent SS Ball.

NOTE

Take care not to damage the O-ring on the threads.