English, 7 electric board installation – CAME Gard 8 24v D.C User Manual
Page 11
11
T
h
e d
at
a a
n
d i
n
fo
rm
at
io
n p
rovi
d
ed
i
n
t
h
is
m
an
u
al
a
re to b
e c
o
n
si
d
er
ed
s
u
sc
ep
ti
b
le to c
h
an
g
e a
t a
n
y t
im
e w
it
h
o
u
t w
ar
n
in
g
, by CAM
E c
an
ce
ll
i a
u
to
m
at
ic
i S
.p
.A
.
ENGLISH
- Release the gearmotor and
manually turn the spring to
increase or decrease traction until
the bar rests at 45°.
- Tighten the blocking nut and refasten the gearmotor.
Note: make sure the spring functions properly:
- the spring is loose when the bar is in the vertical position (at rest)
- the spring is tight when the bar is in the horizontal position (tense).
5.7 Electric board installation
- Loosen the three screws in the container cover located in the
upper part of the unit.
- Insert the board in the container and fasten it with the screws
provided; carry out all the electrical connections (see the dedicated
technical documentation enclosed with the board).
:,