beautypg.com

English, 4 standard installation 5.5 assembly diagram fig.3, 6 installing the unit – CAME Frog-A 230v User Manual

Page 4: Fig.2

background image

T

h

e d

at

a a

n

d i

n

fo

rm

at

io

n s

h

ow

n i

n

t

h

is

m

an

u

al

m

ay b

e c

h

an

g

ed by CAM

E

c

an

ce

ll

i a

u

to

m

at

ic

i s

.p

.a

. a

t a

n

y t

im

e w

it

h

o

u

t p

ri

o

r w

ar

n

ing

.

4

ENGLISH

8

6

5

2

4

7

10

9

3

1

9

1

10

3

4x1,5

3x1,5

230V

4x1

2x1,5

RG58

3x1

5x1

2x1

4x1

RX

TX

RX

TX

4x1,5

2x1

11

1) FROG unit
2) Control panel
3) Safety photocells
4) Radio receiver
5) Key-switch selector
6) Antenna
7)

Command push-buthon panel

8) Flashing light
9) Photocell column
10) Shunt box
11) Transmitter

5.4 Standard installation

5.5 Assembly diagram

Fig.3

67

67

160

100

60

3

5.6 Installing the unit

- Check the effi ciency of both moving and non-moving parts on the structure that will be supporting the operator;
- Determine, depending on the type of supporting structure and desired opening, the exact position of the motor assembly by

following the standard applications shown;

- Set up a closing end stop and an opening end stop (fi g. 4, p. 5)
- Dig, depending on the size of the assembly, a foundation pit in the chosen spot (Fig. 3);
- Prepare a drainage system in the foundation, to drain away any water leaks which may cause oxidation (fi g 3 – part.1);
- The foundation box makes for quick and easy setting up of the assembly. Place it inside the pit with the pin aligned to the upper

hinge (Fig. 3 – part. 2), sink it into the cement (Fig. 3 – part. 3) making sure it is perfectly levelled and that the upper edge is 3mm
above ground level (Fig. 3 part. 4);

- Plan for the route of the electrical cables according to the command

and safety instructions using the apposite hole on the box (Fig. 3
– part. 5);

- Grease the rotation pins of the foundation box and the gate attach-

ment lever; the hinge and pin lever must be aligned;

- Position the gate leaf between the upper hinge and the pin lever;

the hinge and pin lever must be aligned;

- Secure the pin lever to the gate leaf, by welding spots 3 to 4 cm

apart along the contact surface. Avoid any welding near the threaded
screws (Fig. 3 – Part. 6).

Fig.2