beautypg.com

Timer operation – Hydrotech 5600 SXT Downflow Service Manual User Manual

Page 8

background image

Page 8

Timer Operation

Meter Immediate Control
A meter immediate control measures water usage and regenerates the system as soon as the calculated system

capacity is depleted. The control calculates the system capacity by dividing the unit capacity (typically expressed

in grains/unit volume) by the feedwater hardness and subtracting the reserve. Meter Immediate systems generally

do not use a reserve volume. However, in twin tank systems with soft-water regeneration, the reserve capacity

should be set to the volume of water used during regeneration to prevent hard water break-through. A Meter

Immediate control will also start a regeneration cycle at the programmed regeneration time if a number of days

equal to the regeneration day override pass before water usage depletes the calculated system capacity.
Meter Delayed Control
A Meter Delayed Control measures water usage and regenerates the system at the programmed regeneration

time after the calculated system capacity is depleted. As with Meter Immediate systems, the control calculates the

system capacity by dividing the unit capacity by the feedwater hardness and subtracting the reserve. The reserve

should be set to insure that the system delivers treated water between the time the system capacity is depleted

and the actual regeneration time. A Meter Delayed control will also start a regeneration cycle at the programmed

regeneration time if a number of days equal to the regeneration day override pass before water usage depletes

the calculated system capacity.
Time Clock Delayed Control
A Time Clock Delayed Control regenerates the system on a timed interval. The control will initiate a regeneration

cycle at the programmed regeneration time when the number of days since the last regeneration equals the

regeneration day override value.
Day of the Week Control
This control regenerates the system on a weekly schedule. The schedule is defined in Master Programming by

setting each day to either “off” or “on.” The control will initiates a regeneration cycle on days that have been set to

“on” at the specified regeneration time.
Control Operation During Regeneration
During regeneration, the control displays a special regeneration display. In this display, the control shows the

current regeneration step number the valve is advancing to, or has reached, and the time remaining in that step.

The step number that displays flashes until the valve completes driving to this regeneration step position. Once all

regeneration steps are complete the valve returns to service and resumes normal operation.
Pressing the Extra Cycle button during a regeneration cycle immediately advances the valve to the next cycle

step position and resumes normal step timing.
Control Operation During Programming
The control only enters the Program Mode with the valve in service. While in the Program Mode, the control

continues to operate normally monitoring water usage and keeping all displays up to date. Control programming is

stored in memory permanently, eliminating the need for battery backup power.

Manually Initiating a Regeneration

When timer is in service, press the Extra Cycle button for 5 seconds on the main screen.

The timer advances to Regeneration Cycle Step #1 (backwash), and begins programmed time count down.

Press the Extra Cycle button once to advance valve to Regeneration Cycle Step #2 (brine draw & slow rinse).

Press the Extra Cycle button once to advance valve to Regeneration Cycle Step #3 (rapid rinse).

Press the Extra Cycle button once to advance valve to Regeneration Cycle Step #4 (brine refill).

Press the Extra Cycle button once more to advance the valve back to in service..

NOTE: If the unit is a filter or upflow, the cycle step order may change..

NOTE: A queued regeneration can be initiated by pressing the Extra Cycle button. To clear a queued regener-

ation, press the Extra Cycle button again to cancel. If regeneration occurs for any reason prior to the delayed

regeneration time, the manual regeneration request shall be cleared.

1.

2.

3.

4.

5.

6.