beautypg.com

Start-up instructions – Hydrotech 5600 SXT Downflow Service Manual User Manual

Page 5

background image

Page 5

Start-Up Instructions

The water softener should be installed with the inlet, outlet, and drain connections made in accordance with the

manufacturer’s recommendations, and to meet applicable plumbing codes.

Turn the manual regeneraton knob slowly in a clockwise direction until the program micro switch lifts on top of

the first set of pins. Allow the drive motor to move the piston to the first regeneration step and stop. Each time

the program switch position changes, the valve will advance to the next regeneration step. Always allow the

motor to stop before moving to the next set of pins or spaces..

NOTE: For electronic valves, please refer to the manual regeneration part of the timer operation

section. If the valve came with a separate electronic timer service manual, refer to the timer operation

section of the electronic timer service manual.
Position the valve to backwash. Ensure the drain line flow remains steady for 10 minutes or until the water

runs clear (see above).
Position the valve to the brine / slow rinse position. Ensure the unit is drawing water from the brine tank (this

step may need to be repeated).
Position the valve to the rapid rinse position. Check the drain line flow, and run for 5 minutes or until the water

runs clear.
Position the valve to the start of the brine tank fill cycle. Ensure water goes into the brine tank at the desired

rate. The brine valve drive cam will hold the valve in this position to fill the brine tank for the first regeneration.
Replace control box cover.
Put salt in the brine tank..

.

NOTE: Do not use granulated or rock salt.

1.

2.

3.

4.

5.

6.
7.