BJM Pumps JX1500HSS-F User Manual
Page 27
START-UP REPORT FORM
Voltage supply at panel line connection, pump on
L1-L2
L2-L3
L3-L1
Amperage load connection, pump on
L1
L2
L3
FINAL CHECK
Is pump secured properly?
Yes
No
Was pump checked for leaks?
Yes
No
Do check valves operate properly?
Yes
No
Flow: Does station appear to operate at
proper rate?
Yes
No
Noise level:
Acceptable
Unacceptable
Comments:
Describe and equipment difficulties during start-up
Installed by:
Company:
Person:
Date:
Maintained by:
Company:
Person:
Date and time of start-up
Present at start-up:
( ) Engineer’s name
( )Contractor’s name
( ) Operator’s name
( ) others