Start-up report form – BJM Pumps JX SERIES SIDE DISCHARGE Electric Submersible Pumps User Manual
Page 38
START-UP REPORT FORM
START-UP REPORT FORM
This form is designed to record the initial installation, and to serve as a guide for troubleshooting at a
later date (if needed).
BJM Pumps, LLC
123 Spencer Plain Road
Old Saybrook, CT. 06475
Pump Owner’s Name
Address
Location of Installation
Person in Charge
Phone( )
Purchased From
Model
Serial No
Voltage
Phase
Hertz
HP
Does impeller turn freely
by hand?
Yes
No
Condition of Equipment
New
Good
Fair
Poor
Condition of Cable Jacket
New
Good
Fair
Poor
Rotation: Direction of Impeller Rotation (Use C/W for clockwise, CC/W for counterclockwise):
Method used to check rotation (viewed from bottom)
Resistance of cable and Pump Motor (measured at pump control)
Red-Black
ohms
Red-White
ohms
White-Black
ohms
Resistance of ground circuit between control panel and outside of pumps
Ohms
MEG
OHM CHECK OF INSULATION
Red to ground
White to ground
Black to ground
Condition of location at start-up
Dry
Wet
Muddy
Was equipment stored
If YES, length of storage:
Yes
No.
Liquid being pump
Debris in bottom of station?
Yes
No
Was
debris
removed
in
your
Yes
No