beautypg.com

Backfilling, Operation, Opera t ion – Alamo 4211 MSL User Manual

Page 80

background image

OPERATION

4211-4211SS MSL 01/11

Operation Section 4-34

© 2011 Alamo Group Inc.

OPERA

T

ION

BACKFILLING

Approach pile with a level bucket.

Poor methods actually move no more dirt and make
it more difficult to hold a level grade.

Do not use bucket in dumped position for
bulldozing. This method, shown above, will impose
severe shock loadings on dump linkage, bucket
cylinder and tractor.