beautypg.com

American Standard Copeland T005740 User Manual

Page 2

background image

M 9 6 8 0 1 5

2

INSTALL HANDLES

Should the hot and cold water supply pipes have been transposed making
adjustment impossible, proceed as follows:

TRANSPOSED SUPPLY PIPING

OR BACK TO BACK INSTALLATION

3

Remove check stops and re-install them transposed.

Shut off water supply.
Remove handle and rim. (Reverse steps 1 and 2.

CHECK STOP

(RED TO BLUE)

Turn the water supply back on and perform the temperature adjustment in step 4.

Assemble HANDLES and TRIM.

CHECK STOP

(BLUE TO RED)

Important note: RED CHECK STOP is now on the right of the mixer body and the BLUE
CHECK STOP is now on the left.

10

11

13

8

9

Align and install HANDLE BASE (1) onto TEMPERATURE CONTROL KNOB (2).

Install HANDLE ADAPTER (3) onto HANDLE BASE (1) and tighten

with SCREW (4).

Align HANDLE (5) and push onto HANDLE ADAPTER (3).

Tighten SET SCREW (6) in handle with HEX WRENCH (7) SUPPLIED.

Install HANDLE ADAPTER (8) onto VALVE STEM (9).

Install HANDLE SCREW (10) and tighten.

Push VOLUME CONTROL KNOB (11) onto HANDLE ADAPTER (10).

Use HEX WRENCH (7) supplied and tighten SET SCREW (12) to secure

VOLUME CONTROL KNOB (11).

Push in PLUG BUTTON (13).

2

12

1

4

6

3

5

7

TOP

1

Remove PLASTER GUARD (1) if attached.

Push CAPS (2 & 2a) as shown onto CONTROL
VALVES (3).

Push ESCUTCHEON HOLDER (4) with lightly greased
O-RING SEALS (5) over CAPS (2, 2a).

Attach the FIXATION PLATE (7) to the ESCUTCHEON
HOLDER (4) with the two SCREWS (6) provided.

Push ESCUTCHEON (8) flush against finished wall.

1

TRIM INSTALLATION

2

2a

1

4

5

6

8

3

7