
STEP 12 - STOP BRACKETS
12
STEP 14 - U-JOINT & CRANK HANDLE
14.1 Install the Universal Joint using two 3/8” x 2” bolts and two 3/8” locknuts.
14.2 Install the Crank Handle using one 1/4” x 2 1/2” bolt and one 1/4” locknut.
-NOTE: Universal Joint may be pre-assembled to the Crank Handle.