Installation, Operation – Schreiber Chillers Excellon MM30AC User Manual

Page 9

background image



INSTALLATION

1. Place chiller on level ground.
2. Allow 3-in of clearance in the front and in the back of the unit. This clearance

is necessary for air circulation through to the unit. If the airflow in and out of
the chiller is restricted the chiller’s cooling capacity is reduced.

3. Connect chiller to power supply. Refer to the nameplate for electrical circuit

requirements.

4. Connect chilled water piping.
5. Fill tank with water to proper level at the fill port. Note the when the chiller is

started the water level will drop slightly as the pipes are filled. Add more
water after the unit is started.

3’ 3’



OPERATION

1. After all electrical and plumbing connections are made, and the reservoir is filled,

You are ready to start the unit.

2. Turn the main power switch to the “ON” position, and the pump is running
3. The temperature displayed is the chiller discharge temperature. Refer to controller

page to modify the setting. Do not set the temperature less than 40

°F. You will

damage the unit.


8