beautypg.com

Schreiber Chillers 1500ACsf User Manual

Page 4

background image

WATER CHILLER STARTING CHECKLIST








PROPER VOLTAGE

Check the voltage on the chiller to see that it matches your power supply.








CRANK CASE HEATER


Power to the unit should be on for 3 hours prior to full usage to allow the crank case
heater to heat the compressor. PLEASE READ SECTION ON CRANK CASE
HEATER ON PAGE 17.











MOTOR ROTATION

Make sure the fan motors and water pumps are running in the correct rotation. If the
water pumps run for more than a short period in the wrong direction, the seal might
back off the shaft. To test if the water pumps are rotating in the correct direction, turn
the pump switch on and off quickly. The compressor switch is used to test the fan
motors rotation.

The compressors to this unit always run in the correct rotation.










SERVICE ACCESS PANEL

The service access panel must be in place when the unit is running. If it is not in place,
the unit will cut off on the high-pressure limit switch, or be inefficient in its capacity.
Also, it is dangerous to install panels while the unit is running.
PLEASE READ - IMPORTANT

1500AC.doc


TEMPERATURE CONTROL


The temperature control is reading the discharge and return water temperature in
Fahrenheit.
Keep in mind this is a two stage refrigeration system. Each stage has its own
thermostat; they must be set to the desired temperature.