The use of pipe couplings in the suction line is not
recommended.

Strainers

If a strainer is furnished with the pump, be certain
to use it; any spherical solids which pass through a
strainer furnished with the pump will also pass
through the pump itself.

If a strainer is not furnished with the pump, but is
installed by the pump user, make certain that the
total area of the openings in the strainer is at least
three or four times the cross section of the suction
line, and that the openings will not permit passage
of solids larger than the solids handling capability
of the pump.

This pump is designed to handle up to 2-1/4 inch
(57 mm) diameter spherical solids.

Sealing

Since even a slight leak will affect priming, head,
and capacity, especially when operating with a
high suction lift, all connections in the suction line
should be sealed with pipe dope to ensure an air-
tight seal. Follow the sealant manufacturer’s rec-
ommendations when selecting and applying the
pipe dope. The pipe dope should be compatible
with the liquid being pumped.

DISCHARGE LINES

The discharge line must be the same size

as, or larger than, the suction line. Never in-

stall or operate the pump with a discharge

line smaller than the suction; a restricted

discharge line will cause excessive friction

loss resulting in overloading and destruc-

tion of pump and drive components.

Valves

The pump is provided with integral suction and dis-
charge check valves.

Never install a positive shut-off valve in the

discharge line; discharge restrictions will

cause excessive friction loss resulting in

overloading and destruction of pump and

drive components. It is strongly recom-

mended that unless absolutely necessary,

no positive shut-off valve be installed in the

suction line; excessive restriction will

cause incomplete filling of the diaphragm

chamber and result in shortened dia-

phragm life.

ALIGNMENT

Before attempting to open or service the

pump:

1. Familiarize yourself with this man-

ual.

2. Shut off incoming power to the mo-

tor and lock it out to ensure that the
pump will remain inoperative.

3. Allow the pump to completely cool

if overheated.

4. Close the discharge valve (if

used).

5. Drain the pump.

It is imperative that alignment be checked

before the pump is operated.

The pump and motor were aligned and secured at
the factory, but fastening hardware may have loos-
ened during shipment. It is imperative that this
hardware and the alignment be checked after the
pump is installed and

before operation. Adjust-

ments may be made by loosening the securing
hardware and shifting or shimming components
as required.

To check coupling alignment, use a feeler gauge or
taper gauge between the coupling halves every