beautypg.com

Basic setup; pump control 1, Signal list – Xylem CONNECT Quick Guide User Manual

Page 10

background image

10

Basic Setup; Pump Control 1

This section will show and explain how a Connect

®

is configured as pump

controller for a wastewater pump station with 2 pumps.

The function “Pump Control 1” is used to control the pumps through the level
in the pumping sump.

The picture shows an example on 2-pump station with 2 submerged pumps.

Signal List

First step is to create a signal list to create a full overview of the signal from
the pump controller to the pumps and from the pumps to the controller.
The following table shows examples from an typical pump station.