beautypg.com

Bell & Gossett DN0145D HS Vacuum Heating Units Series HVTM User Manual

Warning, Hoffman specialty, Vacuum heating units series hv

background image

INSTRUCTION MANUAL

DN0145

REVISION D

Hoffman Specialty

®

Vacuum Heating Units

Series HV

(25,000-60,000 Sq. Ft. EDR)

SERIES HV

UNITS

25,000-60,000 SQ. FT/. EDR

Morton Grove, Illinois 60053

TM

SERIES HV

MODEL

SERIAL

GPM

PSI

PUMP

CFM

IN HG.

PUMP

DWGS

POWER V.

PH.

HZ 60

CONTROL V.

PH. 1

HZ 60

TOTAL

LARGEST MOTOR

F.L. AMP

F.L. AMP

DN0016

HOFFMAN SPECIALTY

®

INST

ALLER:

PLEASE LEA

VE THIS MANUAL FOR THE OWNER’S USE.

SAFETY

INSTRUCTIONS

This safety alert symbol will be used in this manual and on

the unit safety instruction decals to draw attention to safety
related instructions. When used, the safety alert symbol
means ATTENTION! BECOME ALERT! YOUR SAFETY IS
INVOLVED! FAILURE TO FOLLOW THESE INSTRUCTIONS
MAY RESULT IN A SAFETY HAZARD.

CAUTION

DO NOT RUN PUMP DRY,

SEAL DAMAGE MAY OCCUR.

INSPECT PUMP SEAL

REGULARLY FOR LEAKS,

REPLACE AS REQUIRED.

FOR LUBRICATION

REQUIREMENTS, CONSULT

SERVICE INSTRUCTIONS.

FAILURE TO FOLLOW

INSTRUCTIONS COULD

RESULT IN INJURY OR

PROPERTY DAMAGE.

P70644

EXPLOSIBLE

WARNING

DO NOT PRESSURIZE TANK.
ISOLATE TANK DURING LEAK TEST.
DO NOT RESTRICT VENT.
DO NOT PLUG OVERFLOW.
OPEN INLET VALVES SLOWLY.
DO NOT USE AS A FLASH TANK.

FAILURE TO FOLLOW
INSTRUCTIONS COULD RESULT
IN SERIOUS INJURY OR DEATH.

(2) All Units

DN0483 (Small) - DN0484 (Large)

DN0116 Units with Panel

P70644 All Units

EXPLOSIBLE

WARNING

ISOLATE TANK

DURING LEAK TEST

(2) All Units

DN0485 (Small)

DN0486 (Large)

If the decals as noted below are missing or are illegible con

-

tact your local B&G representative for a replacement.
1. Electrical connections to be made by qualified Electrician in

accordance with all National, State and Local codes.

2. Motor must have properly sized starter with properly sized

heaters to provide overload and undervoltage protection.

3. If pump, motor or piping are operating at extremely high or

low temperatures, guarding or insulation is required.

4. Operating personnel should be trained in the operation of

pumps and associated systems (condensate, boiler feed, etc.).