5) Place new fill valve inside tank hole.
6) Thread mounting nut onto fill valve shank and tighten the nut.
NO TE: Do not over-tighten. Be sure to install fill valve in a position that does not

interfere with the trip lever operation.

7) Connect water supply to fill valve shank and hand-tighten only.
NO TE: Do not overtighten. These are plastic parts. Never use pipe dope on any

water supply connection.

8) Attach refill tube to fill valve nipple and clip other end of refill tube to the overflow

pipe.

9) Turn water supply ON and check for leaks outside the tank.
NO TE: As water fills the tank, water is also directed into the overflow tube via the

refill tube. This additional flow of water is critical to refilling your toilet’s bowl.

Once the water stops filling the tank, some residual drops of water may drip from

the fill valve. This is NORMAL as these drops will subside.

Water Level Adjustment

Depending on the manufacturing plant, you may have one of two of the following fill
valves:

Type A

Type B

Water Level

For Type A and Type C Fill Valve:

Refer to the water level (WL) setting marked

on the inner wall of the tank. Allow the water

to fill the tank. Turn the adjustment screw

clockwise in the (+) direction to increase the

water level height (see Illustration 1). Turn the

adjustment screw counter-clockwise in the (-)

direction to decrease the water level height.

Flush the toilet to verify the correct water

level. Adjust as necessary.

For Type B Fill Valve:

There are no water level adjustments. The fill

valve has been preset at the factory.

Top of

Overflow

Tube

Water

Level

Ill. 1

Installation Procedures (continued)

Type C