Site Preparation (new installation)

Proper floor support must be provided. Review the product specification sheet for load require-

ments.

WARNING: Do not support the bathtub by the rim. Provide adequate support under the

bathtub feet.

Ensure the flooring has adequate support for the bathtub. Verify the sub-floor is level and flat.

Construct 2 x 4 or 2 x 6 stud framing. Allow for the thickness of the finished wall.

Verify the water supply location according to the specification sheet. Cap supply lines and check
for leaks.

!

Installation

Before You Start

Prior to installing inspect the bathtub for damages. Place the bathtub back into the packaging or
cover with a drop cloth to prevent damage during the rest of the construction.

TOTO® Cast Iron Bathtubs are designed for a variety of installations depending on the model
selected. Follow only the installation instructions for your particular model/installation.

Provide properly dimensioned framing.

Adequately level the sub-floor for proper support of the bathtub.

Ensure proper access to the final plumbing locations.

All TOTO® Cast Iron Bathtubs are ASME Standard A112.19.1 compliant.

1

2

Suggested Framing for Bathtub Installation

Install Drain

WARNING: Do not lift or move the bathtub without assistance. A cast iron bathtub is extremely

heavy and may cause personal injury.

WARNING: Do not support the bathtub by the rim. Provide adequate support under the bath-

tub feet.

Install the bathtub drain according to the manufacturer’s instructions.

Place a drop cloth inside the bathtub to provide surface protection during installation.

!

!

3

4

Frame the floor.

Position the
rough
plumbing.

Deck Installation

Suggested for FBY1500, FBY1510, FBY1550,
FBY1700 and FBY1800 models.

Alcove Installation

Suggested for FBY1515, FBY1525 and FBY1715
models.

Provide a 1/16” (2
mm) gap between
the bathtub rim
and the framing.

Verify the sub-floor offers
adequate support and is
flat and level.

Position the
rough
plumbing.

Construct 2 x 4
or 2 x 6 stud
framing

Construct 2 x
4 or 2 x 6 stud
framing

Verify the sub-floor offers
adequate support and is
flat and level.