beautypg.com

Factory Direct Hardware Hansgrohe 10458 Axor Starck User Manual

Page 14

background image

6

Installation – 10452181

Use the rough as a template to mark the positions of

the screw holes in the subfloor. Use an 8 mm bit to

drill the holes.

Install the anchors (included).

Fasten the rough to the subfloor with the screws

provided. Make sure that the rough is level.

Wrap the threads on the supplies with Teflon thread

tape.

Install the supplies in the rough. For proper

operation of the tub filler, the hot supply should be

installed on the left, the cold supply on the right.

Remove the flush insert plug from the cold water

side of the rough using a 17 mm wrench. Install a

hose bibb and a hose. Turn on the water and allow

the line to flush thoroughly.

Repeat the flushing procedure on the hot water side.