Accessories, Setting up and operation – Prokit's Industries SS-612B User Manual
Page 3

Understand your product
Study the operating features and safety requirements at first
before using the heat gun. Use the tool and accessories only
for the application intended.
Use tools only following instructions, prohibit any usage out of
the range.
1. Motor housing
2. On/Off switch and temperature switch
3. Handle
Accessories
Contains:
If you find anything wrong, do not use the tool until the parts have been replaced or the
faulty has been rectified. Failure to do so could result in serious personal injury.
If any product defectiveness or missing parts was found, please do not use it until the
parts have been replaced or the faulty has been rectified. Failure to do so could result in
serious personal injury.
Setting up and Operation
The switch contains function of power on/off, temperature low/high. The low tempera-
ture is roughly 380°C, and high temperature is roughly 500°C.
Always ensure the power switch is at off position before plugging in.
Set power switch to I or II to heat one minute to reach its operation temperature.
Always wear protective gloves and eyes protection when working.
Place the heat gun upright on a flat table carefully.
•
•
•
2
1
2
3