PowerWalker VI 1000 IEC User Manual
Page 4

Before the installation, please ensure the power switch on the UPS is in “OFF”
position, and the voltage of the AC utility source corresponds to the identification label
on the rear panel.
1.
Inspection
Inspect the UPS upon the receipt. If there is any damage, please report it to dealer
immediately. The packaging is used recyclable material, please save it for reuse or
dispose of it properly.
2.
Placement
Install the UPS in a protected area within a temperature range from 0 - 40
℃ and
relative humidity of 0 - 90% without condensing. And place the UPS in a location
free from excessive dust and chemical fumes. Please notice that the UPS voltage and
power rating match to the line voltage and load requirements.
3.
Connection
Connect the power cord to the utility power to power up the UPS. Press “ON” button
to turn on the UPS, the green light indicator illuminates that AC utility voltage is
present.
4.
Charge the Battery
Charge the battery automatically when UPS is connected to utility power. Some
charges may be lost. It is recommended that the battery will be re-charged for at least
8 hours before using the UPS.
5.
Connect the Computer
Connect the interface cable from your computer to the output receptacles on the back
panel of the UPS.
6.
Connect the Telephone/Modem Line
Connect a single telephone cable into the “IN” telephone/modem surge suppression
port on the back of the UPS. Require another length of telephone cable to connect
into “OUT” telephone/modem port on the back of UPS to the modem input socket.
7.
Connect the RS-232/USB*Communication Port
Connect a RS-232 serial cable/USB cable from RS-232/USB communication port on
the back of the UPS to Computer Systems that will be auto detected.
8.
Green Mode Function(1000VA only)
“Green mode” enables to save the power if none of the load is connecting.
9.
DC Start Function
When the power is not supplied from AC utility, DC start function will be started up
automatically.
10.
Switch Off
Press “OFF” button to turn off the UPS after use or test.
*optional
4. INSTALLATION