beautypg.com

Moog Music Etherwave Plus Kit (Upgrade Instructions) User Manual

Page 5

background image

7) Install the 11-213 board into the cabinet with the three 15mm nylon hex nuts.

8) Install the following panel components into the front panel locations listed (shown in figure 6). For the pots and

jacks, use a lockwasher between the component and the inside of the panel. On the outside of the panel install

the flatwasher between the nut and the panel:

Jacks

install in locations

Audio Out, Phones Out

50KB potentiometers install in locations

Brightness, Waveform

5KB potentiometers

install in locations

Pitch, Volume

50KA potentiometer install in location

Phones Vol.

Power switch

install in location

Power

figure 5

figure 6

9) Make sure the Potentiometers are installed so the leads are closest to the top of the enclosure are uniformly

straight.