Assembling the roof panel clips, Chapter 7: roof assembly – Grain Systems Tanks PNEG-4072A User Manual
Page 98
Figure 7-22 Attaching the rafter to the eave bracket
A
A-frame rafter assembly
D
1/2 in. flange nut (S-10253)
B
1/2 x 1-3/4 in. flange bolt (S-10252)
E
Hole for alignment tool
C
Eave bracket (CTR-0429)
After You Finish
Continue to the next A-frame installation until all of the A-frame rafter assemblies are installed. See
Temperature Cable Brackets and A-Frame Assemblies, page 76
.
Assembling the Roof Panel Clips
The roof panel clips are located at the top of the roof rafters nearest to the center collar rafter clips.
Before You Begin
The A-frame rafters should be fully assembled and installed to the center collar and the eave brackets.
What You Should Know
The A-frame assembly consists of two roof rafters identified as the left-hand roof rafter (A) and the right-
hand roof rafter (C). The roof panel clip is installed between each rafter after the A-frame assemblies are
installed.
1. Attach the two roof panel clips (B) to the left-hand roof rafter (A), and install two flange bolts (D) and
two flange nuts (E) securing the roof panel clips to the left-hand roof rafter.
2. Attach the third roof panel clip (B) to the right-hand roof rafter (A), and install two flange bolts (D) and
two flange nuts (E) securing the roof panel clips to the right-hand roof rafter.
98
Pneg-4072A 72 Ft Diameter 40-Series Bin