beautypg.com

Discharge tube installation – Grain Systems Bin Accessories PNEG-066 User Manual

Page 16

background image

16

PNEG-066 2.66" & 4.00" Side Draw Installation

4.00" Side Draw Systems

Discharge Tube Installation

1. Use bottom holes in last chute to locate discharge tube. See Detail "B" for hole dimensions in sidewall

sheet. (Approximately 14" below 5th horizontal seam.)

2. For proper watershed, install plate so upper body sheet overlaps plate as in detail "C".
3. Use discharge tube assembly for template. Drill all holes 3/8" diameter.
4. Use 2 beads of caulking to seal discharge plate to body sheets, use 3/8" bolts and nuts provided to bolt

discharge sheets to body sheets.

11"

7-1/2"

14"

7"

5th RING SIDE SHEET
FROM BASE

1-1/2" MIN RAD. AT
CORNERS

DETAIL "B"

19"

22"

DETAIL "A"

WIND RING
INSTALLATION

Installation of side draw
systems on some 4.00"
Corrugation tanks require
additional wind rings.

NOTE: Unloading tube and
support from rack and pinion
are not provided by G.S.I