beautypg.com

Peak ring, Roof – Grain Systems Tanks PNEG-257 User Manual

Page 31

background image

7. Roof

PNEG-257 12', 15', 18' and 21' Bulk Feed Tanks BFT and GHT Series

31

Peak Ring

The peak ring may now be installed. Again use two (2) strips of caulking between peak ring and roof
panels.

(See Figure 7C.)

Note that the peak ring goes to the outside of the roof panels.

Figure 7C

Figure 7D

Caulking

Peak ring

Caulking