Th-pf installs_5, Installation complete, Step 15. roll adjustment step 16. tilt adjustment – Atdec Telehook TH-PF Installation manual User Manual
Page 5
Installation Complete
No portion of this document or any artwork contained herein should be reproduced in any way without the express written consent of Atdec Pty Ltd.
Due to continuing product development, the manufacturer reserves the right to alter specifications without notice. Published 30.01.13 ©
2. Pull up spring catch.
+20°
-20°
+5°
-5°
Step 15. Roll Adjustment
Step 16. Tilt Adjustment
Loosen Phillips Head Screws 1-4 for Roll Adjustment of ±5° and
tighten to fix position.
FRONT VIEW
Loosen Phillip Head Screws 5-8 for Tilt Adjustments of ±20° and
tighten to fix position.
1
2
6
8
SIDE VIEW
3
4
5
6
7
8
1
2
FRONT
TOP VIEW
Note: When mounting
the projector mount
flush to a ceiling,
depending on the
size and shape of the
projector a maximum
tilt of ±10° can be
achieved.
Removing the projector from mount (Warning care needed to remove projector)
3. Move the projector round so the stud is partially out the hole.
4. Carefully rotate the projector to the end of the keyhole. When
the stud reaches the end of the key hole the projector will be unsup-
ported. Be ready to take the weight of the projector and lower it
down away from the mount.
1. Remove security screw installed in STEP 14
FRONT
BACK
BACK