VEGA VEGAPULS 62 (≥ 2.0.0 - ≥ 4.0.0) Profibus PA Approval according to LPR radio standard User Manual
Page 38
-
Condensation
-
Slight foam generation
-
Overfilling possible
Storage tank on ships (Cargo Tank):
l
Product speed: slow filling and emptying
l
Vessel:
-
Installations in the bottom section (bracers, heating spirals)
-
High sockets 200 … 500 mm, also with large diameters
l
Process/measurement conditions:
-
Condensation, buildup by movement
-
Max. requirement on measurement accuracy from 95 %
Stirrer vessel (reactor):
l
Setup: all vessel sizes possible
l
Product speed:
-
Fast to slow filling possible
-
Vessel is very often filled and emptied
l
Vessel:
-
Socket available
-
Large agitator blades of metal
-
Vortex breakers, heating spirals
l
Process/measurement conditions:
-
Condensation, buildup by movement
-
Strong spout generation
-
Very agitated surface, foam generation
Dosing vessel:
l
Setup: all vessel sizes possible
l
Product speed:
-
Fast filling and emptying
-
Vessel is very often filled and emptied
l
Vessel: narrow installation situation
l
Process/measurement conditions:
-
Condensation, buildup on the antenna
-
Foam generation
Standpipe:
l
Product speed: very fast filling and emptying
l
Vessel:
-
Vent hole
-
Joins like flanges, weld joints
-
Shifting of the running time in the tube
l
Process/measurement conditions:
-
Condensation
-
Buildup
Bypass:
38
VEGAPULS
62 • Approval according to LPR radio standard
6 Set up with the indicating and adjustment module
41720
-EN
-120301