3 connecting switch to the client system, 4 connecting to a power source and powering on – Accusys ExaSAN SW08-Q4 User Manual
Page 11

1.3.3 Connecting Switch to the Client System
1. Insert one end of the QSFP cable into one of the client module ports on the rear panel of the switch. Your
cable connector is securely plugged when you hear a click. If you need to unplug the cable, pull the ring on the
connector firmly until it is detached from the port.
2. Insert the other end of the cable into the QSFP port on the HBA,
which you installed on the client system earlier in Section 1.3.1.
3. Repeat steps 1 and 2 for client systems #2.
4. Plug a power cord into the AC power-in port on the rear panel of the
switch. Do not turn power on yet.
1.4 Connecting to a Power Source and Powering On
Before powering on, make sure that all cables and cords are properly installed and connected.
1. If not yet plugged into the wall electrical outlet, plug the power cord for the storage unit and the ExaSAN switch
to a power source.
User Guide
P9
Caution:
Follow the power-on sequence shown bellow to prevent damage to system.