Above Floor Installation Guide

Part Number 650-000-221/0298

3

Tube Layouts for Radiant Heating

Obtain Tube Layout Drawing

Meet with General Contractor

Obtain Materials

Obtain Special Equipment

Pre-Installation Check List

Mark Tube Layout on Subfloor

Mount Manifold(s)

Install the Tubing

Before Leaving the Jobsite . . .

Inspect Tubing Before Flooring Inst.

Pressurize Tubing for Observation

Pressure Test Tubing

Connect System Piping

TYPICAL SEQUENCE

!

!

Site Preparation
Rough in utilities

! Calculate heat loss

and design radiant
system

!

!

Pour Foundation &
Main Slab
Building Closure

!

!

!

Drywall
Finish Carpentry
Finish Flooring

! Interior Framing,

Plumbing, Electrical

Heating

Contractor

Others

!

!

!

Set Tube Layout
Review Plans and
Trade Guides with
General Contractor
Purchase materials
and equipment

! Inspect and Test

System After
Building Completion

ALUMIPEX STEP-BY-STEP - - -

ABOVE FLOOR INSTALLATION

4

8

9

10

7

Page

CONTENTS

11

11

12

18

17

14

18

19

Inspection, Repair & Troubleshooting

19

18

!

!

Install and Test
AlumiPex Manifolds
and Tubing
Install System Piping
& Heating
Components