Sleeper layout - above floor (typical), Above floor installation guide – Weil-McLain AlumniPEX Radiant Heater User Manual
Page 15
Above Floor Installation Guide
Part Number 650-000-221/0298
15
Figure 10 - Typical sleeper layout and installation
5
5
5
SLEEPER LAYOUT - ABOVE FLOOR
(Typical)
1
SLEEPERS
!
!
!
!
Typically sleepers are 1 x __ lumber or
.
Space 1" apart as shown to provide room for heat emission
plate tubing channel and for thermal expansion.
Begin at one side of the room. Place a 1 x 4 spacer (item 3)
" from wall as shown.
Leave a 1" gap between spacer and first sleeper. Then glue
and nail sleepers in place.
(Width of sleeper is equal to the required tube spacing less
1 inch.)
¾" CDX plywood
¼
2
END SUPPORT SLEEPERS
!
!
!
Typically cut from 3/4" plywood.
Use a router and circle cutting template or fixture to route
3/4" wide x 5/8" deep channels as shown..
Place the end supports about
" from the wall to allow
room for expansion. Then glue and nail in place.
(Width of end sleepers
should equal tube bend radius plus 4 inches.)
¼
3
SPACERS
!
!
!
Typically 1 x 4 furring strips.
Place spacers about
from the wall to allow room
for expansion. Then glue and nail in place.
Use a spacer between the wall and one of the end
support sleepers to provide a channel for the tubing to
leave the room as shown.
¼"
4
TUBING PATH
!
Provide a 1" gap between spacer and end support
sleeper for routing tubing out of room. This will allow
placement of a heat emission plate along this route.
5
PROVIDE GAP AROUND PERIMETER
!
Provide
" gap around entire perimeter of room to
allow for expansion.
¼
These drawings are conceptual only. Consult Weil-McLain Radiant Guides or Software for actual project layout.
1
1
1
1
1
1
1
2
2
3
4
4
4
4
4
4
4
4
4
3