Cleaning boiler heat exchanger

(continued from previous page)

Access exchanger: Ultra-155, -230, -310 Only
1. Remove gas valve electrical plug from gas valve. Also

remove two electrical molex plugs from blower
assembly.

2. Disconnect gas line union with pipe wrench or

Channel Lock Pliers.

3. Remove air silencer by lifting plastic clamp off gas

line and then gently sliding air silencer down and off
valve.

4. Remove two 5/32” Allen head screws securing blower

assembly to heat exchanger front cover.

5. Remove blower and gas valve assembly.
6. Remove hex head nuts (10mm box end wrench) from

burner cover plate and remove burner cover plate
from heat exchanger.

7. Remove three M4 hex head screws (7mm box end

wrench) and burner clips securing burner to cover
plate. Remove cover plate.

8. Use a vacuum cleaner to remove any accumulation

on the heating surfaces. Do not use any solvent.

9. If the vacuum cleaner is unable to clean completely,

wash the heating surfaces with clean, warm water. If
necessary, use a piece of 20-gauge or lighter sheet
metal ¾" wide by about 18 inches long to loosen
deposits.

10. Inspect the heat exchanger cover plate insulation and

gasket. Replace if damaged. Read the ceramic fiber
WARNING on page 29 before handling or disposing
of ceramic fiber materials.

11. Place cover plate gasket in groove of heat exchanger

cover plate. Replace cover plate.

12. Re-install hex head nuts (10mm box end wrench) on

cover plate mounting studs and tighten in a staggering
pattern until cover plate is uniformly tightened.

13. Re-install blower insuring new gasket, provided in

this kit, is in proper alignment between blower and
heat exchanger front cover.

14. Re-install air silencer by sliding on gas valve venturi

and securing clamp to gas line.

15. Connect the two blower electrical molex plugs.
16. Re-connect gas valve union and gas valve electrical

plug.

Exchanger cleaning continued (ALL models)

1. Close isolation valves on piping to isolate boiler from

system. Attach a hose to boiler drain valve and flush
boiler thoroughly with clean water by using purging
valves to allow water to flow through water make-
up line to boiler.

2. When boiler has been flushed, restore boiler to

operation.

3. Perform startup and checkout procedures of pages 23

and 26.

4. Turn on gas supply and check for gas leaks.

Failure to properly check for gas leaks can
cause severe personal injury, death, or
substantial property damage.

5. Turn on boiler electrical supply and test boiler for

proper operation as stated in the Ultra Boiler Manual.

6. Replace boiler jacket front door when servicing is

completed. See Warning at top of page 33.