beautypg.com

Installation — assembly – Weil-McLain GV Series 3 User Manual

Page 8

background image

8

GOLD GV Series 3 & 4 — Z-Vent II Venting Supplement

Part number 550-110-266/0601

Installation — assembly

continued

Finish the vent installation

Installing condensate tubing

1.

See Figure 11 to install condensate tubing (provided
by others). Use condensate pump if floor drain is
higher than condensate drain on boiler.
If required:

use a low-profile pump — OR —

set boiler on foundation (see GV Boiler
Manual) to allow gravity flow to discharge.

2.

Size pump in gal/hr (boiler model):

0.78 (GV-3)

1.17 (GV-4)

1.56 (GV-5)

1.95 (GV-6)

Refer to pump manufacturer's instructions. Drain
to a non-freezing area.

Figure 11

Installation of condensate tubing

26606

Z-Vent II

vent starter tee

5/8" O.D. tubing,

provided by

others

Vent

If vent pipe or combustion air pipe must be reassembled

When vent pipe or combustion air pipe is disconnected for any reason, it must be reassembled and resealed
according to this Venting Supplement, the direct vent termination kit instructions and the vent pipe manufacturer's
instructions.

Sealant recommended by vent pipe manufacturer must be used as indicated in their instructions.
Vent and combustion air connector piping must be sealed gas-tight to prevent possibility of
flue gas spillage and carbon monoxide emissions, resulting in severe personal injury or death.

This manual is related to the following products: