Vizio XMF1000 User Manual
Page 9

7. Push the bar through the openings in each bracket (
part A) as
shown.
Snap on the leveler (
part E) and verify that the bar is level.
Make any small adjustments, then use a wrench to tighten the 2
lag bolts completely.
8. Using the power drill and the 7/32” drill bit, drill into the top 2
holes as shown.
Ensure you are drilling into the stud. Drill
the hole about 2” into the stud.
7
Level Bar
Tighten Bolts
8
7/32”
7
The bar can be inserted from right to left or left to right,
depending on the end of the bar to which you would like
the handle attached.