beautypg.com

Functional test – Tyco Electronics LD9000 Series User Manual

Page 143

background image

5

FUNCTIONAL TEST

The following test sequence will verify that your pole display is

working properly. Before you start this procedure, you must install the

pole display correctly as outlined under the INSTALLATION section.

The functional test should be done under MSDOS command prompt

by booting up the computer in DOS mode, or shell out to DOS prompt

(in window95/98/ME) or COMMAND prompt (in windows NT/2000).

For double sided displays, the messages will be shown on both sides

at the same time.

NOTE: The actual key entries in the text below are enclosed within quotation

marks ( “ ” ). Do

not type the quotation marks as part of your entries.

Serial Interface Pole Displays Functional Test

This test procedure assumes the pole display is connected to COM1

of the computer. If COM2 is being used, type COM2 where COM1 is

called out.

Close all opened application programs that use the same COM port

before going into DOS command prompt. Enter the following

command lines to open the COM port for communication with the pole

display:

Type “MODE COM1 96,N,8,1” and press the ENTER key.

Type “TYPE CON>COM1” and press the ENTER key.

LD9000, LD9300, LD9400, LD9500 and LD9900

1. Type “ABCDEFGH” and press ENTER key. The display will show

“ABCDEFGH” on the first line.

2. To end the test press Ctrl-C (hold down Ctrl and press C).

LD9200

1. Type “!#1ABCDEFGH” and press ENTER key. The display will

show “ABCDEFGH” on the first line.

2. To end the test press Ctrl-C (hold down Ctrl and press C).

This manual is related to the following products: