Telepresence t3, Room installation guide the wooden panels, Tandberg – TANDBERG Telepresence T3 User Manual
Page 9

PAGE 9/22
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
Note!
These items are included in the Immersive Room Package.
What to unpack: Unpack the three boxes marked
•
Walnut wall panels T3
•
Walnut wall panel corners T3
•
Walnut wall panel Profiles T3
box contents:
•
The box marked
Walnut wall panels t3 contains aluminum baseboards
(not shown), in addition to the items shown to the upper left.
•
The box marked
Walnut wall panels corners t3 contains corner base-
boards (not shown), in addition shown to the lower left.
•
The box marked
Walnut wall panels Profiles t3 contains border lists, in
addition to the following five kinds of profiles:
Note!
It is of utmost importance that you mount the corners first.
Do as follows:
1.
Start at the bottom and build your way up.
2.
Fasten the profile E vertically on the lattice next to the glass walls (it will be
the border between the wooden panels and the glass walls).
3.
Continue by cutting the profile B in appropriate lengths (from the edge of
the corner profile to the radius).
ROOM INSTALLATION GUIDE
ThE WOODEN PANELS
These elements are located in the box
marked
Walnut wall panels t3.
These elements are located in the box
marked
Walnut wall panel corners t3.
8Ч
2Ч
24Ч
16Ч
4Ч
2Ч
8Ч
16Ч