beautypg.com

Site preparation, Required materials provided by customer, 1 required materials provided by customer – Texas Instruments 3000 MCU User Manual

Page 11

background image

SpectraLink Corporation

T1 Remote Module Installation

Link WTS – Link 3000 MCU

2. Site

Preparation

The following steps must be completed before installing the system hardware. If the
steps are not already completed refer to each individual section for details.

1. At the local site, install and test Primary Shelf and Expansion Shelves. Refer to

Link WTS – Link 3000 MCU: Installation (72-0059-01) for information.

2. At the remote site:

2.1 Install a two pair cable to each Base Station as designated on the building

floorplans.

2.2 Terminate the Base Station wiring with RJ-45 crimp-on plugs at the

designated Base Station locations.

2.3 Terminate the Base Station wire at the appropriate cross-connect demarc

blocks.

2.4 Terminate the analog or digital phone extensions from the phone system at

the appropriate cross-connect demarc block, and label the block.

2.1 Required Materials Provided by Customer

Rack

- the shelves are designed to fit into a 19 inch mounting rack. Each shelf

measures 15” high by 19” wide by 9” deep, and weighs approximately 35 pounds
fully loaded. See Prepare Location for Shelves, in the Link WTS – Link 3000 MCU:
Installation
document.

Backboard

space

– as an alternative to rack mounting, the shelves can be wall

mounted to ¾” plywood securely screwed to a wall.

Screws

– required to mount the shelves to the wall, or to secure it in the rack. For

wall mount, six #10-5/8” panhead wood screws (or similar device) are required. For
rack mount, screws required are determined by the rack requirements; typically 10-32
or 1/4-20.

RJ

-

45

Cable

- for network clocked T1 facilities, an RJ-45 cable is required to

connect the designated Master Clock T1 Module to the Intershelf Junction Panel.

Part Number: 72-0059-06-E.doc

Page 11