Shelving installation (cold deli) – True Manufacturing Company TCGR-50 User Manual
Page 13

............ www.truemfg.com ............
True Food Service Equipment, Inc.
11
11
INSTALLATION / OPERATION INSTRUCTIONS
SHELVING INSTALLATION (COLD DELI)
SHELF INSTALLATION:
A. Lift each door up and out of track (do not disconnect
elastic tubing). Stretch elastic surgical tubing and set
doors on each side of unit.
B. Locate brackets, lights, shelves, etc. from cabinet
interior.
C. Locate shelf supports wrapped in micro foam and
install teeth end into stainless pilasters located on
interior walls. Adjust to desired height matching right
and left pairs. (images 1 & 2).
D. Locate the stainless steel shelf and install with
product stop towards the front of the cabinet. Side
flaps should overlap shelf support. Be sure to fit shelf
support tip into front slot of shelf (images 2 & 3).
E. Plug light assembly into any receptacle of cabinet
interior side wall (image 4).
F. Replace doors in track.
NOTE
Three lighting receptacles allow for two additional,
"optional", lighted shelves.
WARNING
Shelf mounted lighting requires a closed circuit. All plugs
must be plugged into side wall receptacles for lights
to work. If less than three shelves are installed be sure
attached caps are plugged into receptacle(s) (image 4).
4
3
2
1
➟