beautypg.com

Shelving installation (cold deli) – True Manufacturing Company TCGR-50 User Manual

Page 13

background image

............ www.truemfg.com ............

True Food Service Equipment, Inc.

11

11

INSTALLATION / OPERATION INSTRUCTIONS

SHELVING INSTALLATION (COLD DELI)

SHELF INSTALLATION:
A.
Lift each door up and out of track (do not disconnect

elastic tubing). Stretch elastic surgical tubing and set

doors on each side of unit.

B. Locate brackets, lights, shelves, etc. from cabinet

interior.

C. Locate shelf supports wrapped in micro foam and

install teeth end into stainless pilasters located on

interior walls. Adjust to desired height matching right

and left pairs. (images 1 & 2).

D. Locate the stainless steel shelf and install with

product stop towards the front of the cabinet. Side

flaps should overlap shelf support. Be sure to fit shelf

support tip into front slot of shelf (images 2 & 3).

E. Plug light assembly into any receptacle of cabinet

interior side wall (image 4).

F. Replace doors in track.

NOTE

Three lighting receptacles allow for two additional,

"optional", lighted shelves.

WARNING

Shelf mounted lighting requires a closed circuit. All plugs

must be plugged into side wall receptacles for lights

to work. If less than three shelves are installed be sure

attached caps are plugged into receptacle(s) (image 4).

4

3

2

1

This manual is related to the following products: