beautypg.com

Appliance set-up, Caution – Quadra-Fire CB1200M-MBK User Manual

Page 18

background image

Page 18

7014-179D

December 16, 2011

R

CB 1200 Pellet Stove

7

Appliance Set-Up

A. Outside Air Kit Instructions

Flex Hose

Hose Clamp

Collar Assembly

Trim Ring

Termination

Cap Assembly

Hose Clamp

Included in Kit: 1 piece of 2 inch x 3 foot flex hose, 2 hose

clamps, 1 collar assembly, termination cap assembly, 1

trim ring, 12 screws.

a. Measure distance from floor to air vent opening in appli-

ance and mark location on wall.

Use saw to cut opening in wall. Cut a 2-1/2 to 3 inch

(64-76mm) opening on inside wall and a 3 to 3-1/2 inch

(76-89mm) opening on outside of house.

b. Use hose clamp to secure flex pipe to collar assembly.
c. Slide trim ring over flex pipe and run pipe through wall.
d. Attach hose to outside termination cap with second

hose clamp.

e. Secure termination cap to outside surface.
f. Secure trim ring to interior wall.
g. Snip corners and remove plate.

Figure 18.1.

h. Align and secure collar assembly with 2 of the 4 holes

as shown.

Figure 18.2.

Tools Needed: Phillips head screw driver; wire cutters;

hole saw or jig saw.

CAUTION

Never draw outside combustion air from:

• Wall, floor or ceiling cavity

• Enclosed space such as an attic or garage

Figure 18.1

1. Rear Installation

Snip Corners

and remove

plate

Figure 18.2

Figure 18.

3

a. Remove rear screen and set aside.
b. Install cover plate over hole in right rear floor.
c. Cut a 2 inch minimum hole in the floor to accommodate

flex hose.

d. Attach hose to termination cap.
e. Place rope under pedestal to close off air leaks.

Screen

Install Cover Plate

Seal Pedestal with 26 in. Rope

Figure 18.4

2. Floor Installation

NO

NO

Secure Collar