beautypg.com

Rb 211 - overhaul workscope, On receipt of engine – Rolls-Royce 1004227 User Manual

Page 59

background image

EPRI Proprietary Licensed Material

RB 211 Maintenance Scope

B-7

RB 211 - Overhaul Workscope

This overhaul workscope is conducted as schedule maintenance at approximately 50,000
Operating Hours, providing the engine had a midlife inspection repair at 25,000 hours.

On Receipt of Engine

• Take pictures of engine on the inbound truck (i.e. tie down straps etc.)
• Inspect and report condition of engine transportation stand and bag.
• Open bag and photograph all four sides of the engine especially engine components or parts

that are damaged or missing.

• Carry out full “booking in” inspection of the engine, checking that the rotating assemblies are

free of rubs and stiffness.

• Any missing parts/components or other visual abnormalities should be immediately reported

to the Customer.

• Remove the Nose Bullet, “A” Frame, Intake Extension Ring etc. and prepare the engine for a

vertical lift.

• Carry out an airflow check of the 01, 03 and 05 module oil lines and record findings.
• Place the engine on the “pot” vertically for removal of all the 06 module components

(i.e. all pipes, harnesses etc.)

• Bulk strip the engine into its five (5) modules.

01 Module:

Air Inlet and Front Bearing Support (Section 1020)

• Detail strip the module – wash, NDT and inspect all components.
• Replace the I.P. Roller Bearing.
• Incorporate MOD 633 on IP front static seal.
• Inspect anti-icing manifold, check for damage, cracks or other defects. Ensure MOD 961 is

embodied.

• Inspect anti-icing sleeve for wear. NOTE: Discuss with Customer deletion of Anti-Ice

System (Mod 1051) where applicable.

• Inspect nose bullet for dents, cracks and other defects. Incorporate IRBT1120.
• Inspect support frame assembly. Incorporate IRBT1120.
• Inspect actuating ring check for free movement.
• Inspect bearing, housing, repaint if necessary.