Roberts Gorden Vantage twin Fire Unitary Infrared Heater TF-250 User Manual
Vantage, Twin fire unitary infrared heater, Installation, operation & service manual
This manual is related to the following products:
Table of contents
Document Outline
- Vantage® TF
- TABLE OF CONTENTS
- SECTION 1: Heater Safety
- SECTION 2: Installer Responsibility
- SECTION 3: Clearances to Combustibles
- 3.1 Required Clearances to Combustibles
- NOTE: 1. All dimensions are from the surfaces of all tubes, couplings and elbows. 2. Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from where the burner and burner tube connect.
- NOTE: 1. All dimensions are from the surfaces of all tubes, couplings and elbows. 2. Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from where the burner and burner tube connect.
- Note: 1. All dimensions are from the surfaces of all tubes, couplings and elbows. 2. Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from where the burner and burner tube connect.
- Note: 1. All dimensions are from the surfaces of all tubes, couplings and elbows. 2. Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from where the burner and burner tube connect.
- SECTION 4: National Standards and Applicable Codes
- SECTION 5: Major Components
- Figure 13: Major Component Descriptions
- 5.1 Standard Parts List
- Part No.
- Description
- TF-120
- TF-160
- TF-200
- TF-250
- TF-300
- TF-350
- TF-380
- Core Packages
- Extension Packages
- Hot Rolled
- with
- Aluminum
- Reflector
- Aluminized with Aluminum Reflector
- Aluminized with Stainless Steel Reflector
- Hot Rolled
- with
- Aluminum
- Reflector
- Aluminized with Aluminum Reflector
- Aluminized with Stainless Steel Reflector
- Part No.
- Description
- 20'
- (6m)
- 30'
- (9m)
- 40'
- (12m)
- 20'
- (6m)
- 30'
- (9m)
- 40'
- (12m)
- 20'
- (6m)
- 30'
- (9m)
- 40'
- (12m)
- 10'
- (3m)
- 20'
- (6m)
- 30'
- (9m)
- 40'
- (12m
- 10'
- (3m)
- 20'
- (6m)
- 30'
- (9m)
- 40'
- (12m
- 10'
- (3m)
- 20'
- (6m)
- 30'
- (9m)
- 40'
- (12m
- 91409300
- 1
- 2
- 3
- -
- -
- -
- -
- -
- -
- 1
- 2
- 3
- 4
- -
- -
- -
- -
- -
- -
- -
- -
- 91409408
- -
- -
- -
- 1
- 2
- 3
- 1
- 2
- 3
- -
- -
- -
- -
- 1
- 2
- 3
- 4
- 1
- 2
- 3
- 4
- 03051101
- -
- 1
- 1
- -
- 1
- 1
- -
- 1
- 1
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 03051601
- 1
- -
- -
- 1
- -
- -
- 1
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 01312700
- 1
- 2
- 3
- 1
- 2
- 3
- 1
- 2
- 3
- 1
- 2
- 3
- 4
- 1
- 2
- 3
- 4
- 1
- 2
- 3
- 4
- 02750303
- 3
- 4
- 6
- 3
- 4
- 6
- -
- -
- -
- 2
- 3
- 4
- 6
- 2
- 3
- 4
- 6
- -
- -
- -
- -
- 02750800
- 2
- 2
- 2
- 2
- 2
- 2
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 027503SS
- -
- -
- -
- -
- -
- -
- 3
- 4
- 6
- -
- -
- -
- -
- -
- -
- -
- -
- 2
- 3
- 4
- 6
- 027508SS
- -
- -
- -
- -
- -
- -
- 2
- 2
- 2
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 03090100
- 3
- 4
- 5
- 3
- 4
- 5
- 3
- 4
- 5
- 1
- 2
- 3
- 4
- 1
- 2
- 3
- 4
- 1
- 2
- 3
- 4
- 91907302
- 6
- 8
- 10
- 6
- 8
- 10
- 6
- 8
- 10
- 2
- 4
- 6
- 8
- 2
- 4
- 6
- 8
- 2
- 4
- 6
- 8
- 03050010
- 2
- 3
- 5
- 2
- 3
- 5
- 4
- 5
- 7
- 2
- 3
- 4
- 6
- 2
- 3
- 4
- 6
- 2
- 3
- 4
- 6
- 91107720
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 90502700
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 01318901
- 1
- 1
- 1
- 1
- 1
- 1
- 2
- 2
- 2
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- Part Number
- Tubing Length Each Side
- Core Packages (2 Required)
- Model
- Minimum
- Hot Rolled with Aluminum Reflector
- Aluminized with Aluminum Reflector
- Aluminized with Stainless Steel Reflector
- TF-120
- 20' (6 m)
- CP20HRS
- CP20ALUM
- CP20ALUMSS
- TF-160
- 20' (6 m)
- CP20HRS
- CP20ALUM
- CP20ALUMSS
- TF-200
- 30' (9 m)
- CP30HRS
- CP30ALUM
- CP30ALUMSS
- TF-250
- 40' (12 m)
- CP40HRS
- CP40ALUM
- CP40ALUMSS
- TF-300
- 50' (15 m)
- CP30HRS + EXP20HRS
- CP30ALUM + EXP20ALUM
- CP30ALUMSS + EXP20ALUMSS
- TF-350
- 50' (15 m)
- CP30HRS + EXP20HRS
- CP30ALUM + EXP20ALUM
- CP30ALUMSS + EXP20ALUMSS
- TF-380
- 60' (18 m)
- CP30HRS + EXP30HRS
- CP30ALUM + EXP30ALUM
- CP30ALUMSS + EXP30ALUMSS
- Additional tubing length may be added to heater. Tubing must be heat-treated, aluminized or porcelain coated. Any additional tubing lengths are considered as vent length for length determination. Maximum venting length for minimum heater length is 45...
- Figure 13: Major Component Descriptions
- SECTION 6: Suggested Layouts
- The following are suggested layouts for the heater. These layouts are effective in maximizing the heat pattern and overall performance of the heater. All heaters can be common vented or individually vented (See Page 37, Section 9) depending on the bu...
- • A minimum of 10' (3 m) of tubing on TF-120/160 and/or a minimum of 15' (4.5 m) of tubing on the TF-200/250/300/350/380 is required between the burner and the Elbow or U Tube.
- • The design and installation must adhere to the rules and guidelines located in this manual (See Page 16, Section 7 and Page 37, Section 9).
- • Review venting options before selecting a layout.
- 6.4 TF-160 - Single Elbow Design (Individual Vents)
- 6.5 TF-160 - Double "L" Design (Individual Vents)
- 6.6 TF-250 - Combination "L" and "U" Design (Individual Vents)
- The following are suggested layouts for the heater. These layouts are effective in maximizing the heat pattern and overall performance of the heater. All heaters can be common vented or individually vented (See Page 37, Section 9) depending on the bu...
- SECTION 7: Heater Installation
- Figure 14: Critical Hanger Placement
- Figure 15: Linear Heater Assembly Overview
- Figure 16: Linear Heater Layout Overview
- Figure 17: Linear Heater Layout Overview (Continued)
- Step 7.1 Burner Tube Installation
- Step 7.2 Burner Installation
- Step 7.3 Tube Clamp Package Installation
- Step 7.4 Coupling and Tube Assembly
- Step 7.4.1 Coupling and Tube Assembly (Continued)
- Step 7.4.2 Coupling and Tube Assembly (Continued)
- Step 7.5 Turbulator Installation
- Step 7.6.1 Reflector, U-Clip and Reflector Support Installation
- SECTION 8: Optional Heater Accessories
- 8.1 U-Tube Configuration
- Figure 18: U-Tube Heater Assembly Overview
- Figure 19: U-Tube Heater Layout Overview
- Figure 20: U-Tube Heater Layout Overview (Continued)
- 8.2 Elbow Package Configuration
- Step 8.2.1 Elbow Installation
- Step 8.2.2 Elbow Installation
- Step 8.2.3 Reflector Joint Installation
- Step 8.2.4 Reflector Joint Installation
- Step 8.2.5 Reflector Joint Detail
- Figure 21: Reflector Joint Detail
- 8.3 Reflector Side Extension
- Step 8.3.1 Bracket Installation
- Step 8.3.2 Side Reflector Installation
- 8.4 Lower Clearance Shield Installation
- Step 8.4.1 Shield Support Strap Assembly
- 8.5 Two-Foot Decorative Grille Installation
- Step 8.5.1 Grille Installation
- Step 8.5.2 Frame Shield Installation
- Step 8.5.3 Reflector Side Extension Installation for Decorative Grilles
- Step 8.6.1 Silicone Cap Installation
- Step 8.6.2 Grille End Cap Installation
- Step 8.6.3 Grille Installation
- SECTION 9: Venting
- 9.1 Venting Requirements
- 9.1.1 United States Requirements
- 9.1.2 Canadian Requirements
- Figure 22: Tube Termination
- 9.7 Horizontal Ventilation 4" (10 cm) Pipe
- 9.8 Vertical Ventilation 4" (10 cm) Pipe
- 9.9 Flexible Boot Installation (Single Vent)
- 9.10 Common Sidewall Venting
- 9.11 Vertical Ventilation 6" (15 cm) Pipe
- 9.12 Flexible Boot Installation (Common Vent)
- 9.13.1 Length Requirements
- 9.13.2 Vertical Outside Air Supply
- 9.13.3 Horizontal Outside Air Supply
- SECTION 10: Gas Piping
- SECTION 11: Wiring
- SECTION 12: Operation and Maintenance
- 12.1 Sequence of Operation
- 1. Turn the thermostat up, the blower motor will energize.
- 2. When the motor approaches nominal running RPM, the pressure switches will close and activate the ignition module.
- 3. After a 45 second purge period, the ignition module then opens the gas valve and energizes both spark igniters. The light will be illuminated at any time the gas valve is energized.
- 4. When both flames are established, the sparking sequence ceases.
- 5. If both flames are not established during the ignition sequence, the ignition module closes the gas valve and purge begins. The module will try two additional times for ignition with purge between trials. If ignition is not established during eith...
- 6. After lock out has occurred, the ignition module must be re-set by turning down the thermostat (disconnecting power) for five seconds, and raising it again to the desired temperature.
- 7. When the thermostat is satisfied, all power to the heater is shut off.
- 12.2 To Shut Off Heater
- 12.3 To Start Heater
- 12.4 Pre-Season Maintenance and Annual Inspection
- 12.5 Maintenance Checklist
- 12.1 Sequence of Operation
- SECTION 13: Troubleshooting
- SECTION 14: Replacement Parts
- SECTION 15: General Specifications
- SECTION 16: The ROBERTS GORDON® VANTAGE® TF Warranty