Roberts Gorden Infrared Heater BH-150 User Manual
Page 25
![background image](/manuals/197483/25/background.png)
SECTION 6: H
EATER
I
NSTALLATION
19 of 59
Step 6.2 Tube Clamp Package Installation
Step 6.3 Coupling and Tube Assembly
Bolt
Tube Clamp
Flat
Washer
Nut
(Torque 120 in/lb
13.56 Nm)
Description
Part Number
Tube Clamp Package
01318901
Tube Clamp
01396801
Bolt
97113940
Flat Washer
95211600
Nut
92113900
Tube
Tube
Orient coupling so that
the impact block is in the
2:00 or 10:00 oclock
positions.
Closed
Open
Tab
3" (8 cm) to
4" (10 cm)
Slide Bar/Coupling Lock
Coupling
Wide End
Coupling
Tube
Slide Bar/Coupling Lock
A
Close coupling
with tab.
B
Start slide bar/coupling lock
onto coupling.
C
Insert tubes into coupling.
D
Tighten coupling to join tubes.
Description
Part Number
Coupling
01329600
Slide Bar/Coupling Lock
01329700
Tube
91409XXX
This manual is related to the following products: