beautypg.com

Nortec NHDI User Manual

Page 17

background image

INTERROGATION OF THE OPERATING

STATUS

The NHSC / NHDI operating and display unit has

a “display menu” from which various operating
parameters can be viewed.

Note: It is not possible to change the values on the

display level.

Operation

Call up the display level with <

ê> or <é>.

<

ê> next operating parameter.

<

é> previous operating parameter.

Exit the display level with <Menu>

Description of the operating parameters on the
display level

The following describes the individual operating

parameters that can be selected using the keys <

ê>

and <

é>, after the display level has been called up.

Steam Productions

Current actual and nominal value of steam

production in percentage of total output.

Nominal value: Unit capacity x input signal value.

Actual value: max. Unit capacity x input signal

value x capacity limitation.

Note: If the internal controller is activated only the

actual value is shown.

Under the following conditions the actual value

may differ from the nominal value: upon activation of
the heating power, if capacity limitation is active during
the filling cycle of the steam cylinder.

Analog Input (humidity demand)

Current value of the signal applied to the analog

input in % of its max. value.

Note: If the internal controller is active the

displayed value corresponds to the current air humidity
(%rh).

Internal Controller

Internal controller activated (”on”)/deactivated

(”off”)

Working Hours

Total of working hours elapsed since initial

commissioning of the steam humidifier.

Time Remaining to minor/major service

The time remaining (in hours) before the next

minor/major service.

Can be increased for poor water conditions or

decreased for good water conditions.

- 14 -

Analog input [%]

25

steam-prod[%]

ref.=50/act=25

Figure #17

NHSC / NHDI Maintenance Intervals

Controller funct

off

elapsed time

623

time to mainten.

600/1200

This manual is related to the following products: