beautypg.com

Powerline P2X User Manual

Page 14

background image

14

S T E P

4

Be careful to assemble all components in

the sequence they are presented.

A.

Attach Press Arm Pivot (Q) to Upper Main Frame (D) as shown using Shaft (16) and:

Two 99 (10mm x 20mm allen head bolt)

Two 101 (10mm washer)

Two 100 (bronze bushing)

Tighten the two Allen Screws (8) in the Upper Main Frame(D)

B.

Attach Right Handle (S)* and Left Handle (T)* to Press Arm (R) as shown using for each handle:

One 51 (10mm x 60mm allen head bolt)

One 70 (10mm nylon lock nut)

Attach Press Arm (R) to Press Arm Pivot (Q) as shown using Shaft (5) and Steel Bushings (6)*.

Tighten the two Allen Screws (8) in Press Arm (R).

Attach Rubber Stop (19) and Jam Nut (47) as shown into Upper Main Frame(D)

C.

*NOTE:

To identify the difference between left and right: notice in the picture in Step 4 the horizontal grips point

out ward, and the smaller grip is angled toward the front of the gym.

*NOTE:

These parts might be pre-installed.

*NOTE:

These parts might be pre-installed.

*NOTE:

Leave the two bolts (50) hand tight.

You will need to install a shroud after cable installation in Step 7.

D.

Install two 110mm diameter Pulleys (4) into Press Arm Pivot (Q) as shown using:

Two 50 (10mm x 215mm allen head bolts)*

Four 3 (pulley spacer)

Four 60 (10mm washer)

Two 70 (10mm nylon lock nut)

E

F

You can now wrench tighten all bolts and nuts in this step. Do NOT re-tighten any of the pad bolts.

Leave all pulley bolts hand tight until the cable installation in Step 13 is completed.

Insert End Caps (1)* to Press Arm Pivot (Q) as shown.

Insert End Caps (7)* to Press Arm (R) as shown.

Insert Round Pop Pin (13)* to Press Arm (R) as shown.

0

10

20

30

40

50

60

70

80

90

100 110 120 130 140 150

0

1

2

3

4

5

6

MM

Inch