S T E P
3
Be careful to assemble all components in
the sequence they are presented.
A.
Attach Seat Pad (AA) to the Seat Pad Frame (L) as shown using:
Two 56 (8mm x 45mm hex head bolt)*
Two 62 (8mm spring lock washer)
Two 65 (8mm washer)
Attach two End Caps (23) to the front and back of Seat Pad Frame (L) as shown.
*NOTE:
Do NOT over-tighten these bolts. Tigten these bolts until spring lock washer is flat.
Over-tighten these bolts will cause T-nuts in pads to strip out.
*NOTE:
Do NOT over-tighten these bolts. Tigten these bolts until spring lock washer is flat.
Over-tighten these bolts will cause T-nuts in pads to strip out.
*NOTE:
These parts might be pre-installed.
*NOTE:
These parts might be pre-installed.
B.
Slide two Plastic Bushings (20)* into the openings in the Lower Main Frame (A) as shown.
Slide the Seat Pad Frame (L) into the two Plastic Bushings (20).
Hold the Seat Pad Frame (L) in place with T-Shaped Pop Pin (21).
To stop the Seat Pad Prame (L) from sliding all the way out insert:
One 57 (6mm x 10mm socket head bolt)
One 102(6mm spring lock washer)
Insert End Cap (2)* into Seat Pad Frame (L) as shown.
Slide two Plastic Bushings (20) into the opening on the Upper Main Frame (D) as shown.
Slide the Seat Pad Frame (N) into the two Plastic Bushings (20).
Hold the Seat Pad Frame (N) in place with T-Shapped Pop Pin (21).
Attach End Cap (2) to Back Pad Adjustment (N) as shown.
Insert T-shapped Pop Pin (26) as shown.
To stop the Seat Pad Prame (L) from sliding all the way out insert:
One 57 (6mm x 10mm socket head bolt)
One 102(6mm spring lock washer)
C.
Attach Back Pad(AA) to the Back Pad Frame (M) as shown using:
Two 56 (8mm x 45mm hex head bolt)
Two 62 (8mm spring lock washer)
Two 65 (8mm washer)
Attach two End Caps (23) to the front and back of Seat Pad Frame (L) as shown.
E.
F.
D.
Attach Back Pad Frame (M) onto Back Pad Adjustment (N) using:
One 95(12mm x 135mm hex head bolt)
One 97 (12mm washer)
One 96 (12mm nylon lock nut)
Two 84 (bushing)*
You can now wrench tighten all bolts and nuts in this step. Do NOT re-tighten any of the pad bolts.
Leave all pulley bolts hand tight until the final cable installation in Step 13 is completed.