Ending an active test – Paradyne 7510-A2-GB20-00 727 User Manual
Page 43
![background image](/manuals/183292/43/background.png)
Testing
5-10
7510-A2-GB20-00
March 1997
Ending an Active Test
A test initiated by the user can be ended by the user.
H
A Test Timeout option is available to automatically terminate a user-initiated
Loopback or Pattern test after it has been running a specified period of time.
Refer to
, Table A-1.
Test Timeout does not pertain to tests commanded by the:
— Network, such as the network-initiated CSU and DSU Loopbacks.
— DTE, such as the DTE-initiated Local Loopback.
H
On each test screen is a command column. Pressing Return when the cursor
is on the Stop command stops the test.
H
Use the Abort All Tests selection from the Test menu to stop all tests running
on all interfaces, with the exception of network or DTE-initiated loopbacks.
Command Complete appears when all tests on all interfaces have been
terminated.