INSTALLATION
8
L20-294, rev. 0 (1/06)
1) Probe
2) High Temperature Limit
1.8. INSPECTION
Before you begin filling and adjusting the appliance, perform the following visual checks:
9
After the appliance is in its permanent location, check the levelness. Any additional leveling that
is necessary can be performed as previously described.
9
Ensure that the probe and high temperature limit is in place and secure. Check the high limit
bulb mounting screws to ensure that they are tight.
9
Review the installation portion of this manual and ensure that all steps have been followed and
executed properly.